Test Stands & Fixtures for Verification and Manufacturing

Practical test stands and fixtures that improve repeatability, de-risk verification, and accelerate manufacturing. I cover mechanical design, embedded control, and data capture so QA can validate later without rework.

Talk to me: info@techkrates.com+41 783 20 66 33

Start small

Test Stand Concept Pack (6–12 hours)

Engineering sketch of a practical fixture/test stand: requirements, architecture outline, key components, and a rough BOM — designed to scale toward industrialization/qualification.

  • Requirements + acceptance criteria (draft)
  • Architecture outline (motion/sensors/control)
  • Rough BOM + build plan

Who it’s for

  • MedTech / Biotech manufacturing and R&D teams
  • Cleanroom or controlled environments with tight process limits
  • Test & assembly lines needing repeatable verification
  • Engineers who need mechatronics + embedded prototypes quickly
  • Teams preparing for later qualification/validation

Typical situations

  • Manual tests are slow, variable, or hard to scale
  • A fixture is needed for critical force, torque, or dimensional checks
  • A verification method must be prototyped before full automation
  • Measurement methods lack repeatability (GR&R/MSA)
  • Data logging is missing for traceable evidence

Deliverables

  • Requirements and test method definition
  • Mechanical concept, CAD, drawings, and BOM
  • Controls (Arduino/STM32), sensors, and safety interlocks
  • Data logging and simple operator UI
  • Build, bring-up, and handover documentation
  • Guidance on what to validate later in regulated environments

PLC/SPS integration via partner network when required.

FAQ

How long does a test stand project take?

Simple fixtures can move in weeks; more complex stands typically run 4–10 weeks depending on parts lead time and iteration cycles.

Remote vs on-site — what do you recommend?

Design and documentation can be remote. Build, bring-up, and handover are most efficient on-site when access to the process is needed.

How are scope changes handled?

Changes go through a clear change request with impact on cost, timeline, and acceptance criteria.

What information do you need from us?

Target measurements, tolerances, sample parts, process constraints, and any existing test data or acceptance criteria.

Need repeatable verification fast?

Start small with a Test Stand Concept Pack to confirm requirements and feasibility.

Scope your project

Share goals and constraints - fastest via email or WhatsApp.

LinkedIn
linkedin.com/in/jaromczyk